Abstract
. The control and planning of operating rooms have became more and more important for hospital managers. Nowadays, the operating rooms, as key resources, often lead to a great time waste. So, appropriate scheduling of operations in order to increase the efficiency of the operating rooms, are significant ...
Read More
. The control and planning of operating rooms have became more and more important for hospital managers. Nowadays, the operating rooms, as key resources, often lead to a great time waste. So, appropriate scheduling of operations in order to increase the efficiency of the operating rooms, are significant research topics in medical care. In this study, a new linear programming model has been developed for the assignment of patients to the operating rooms. Since the duration of surgical procedure is a stochastic parameter, in this paper a two-stage stochastic programming model has been presented in addition the deterministic model. These presented modelssimultaneously investigate the scheduling of surgeries and allocating them to the surgery rooms. The aim of this study is to minimize the cost of assigning patients to unspecialized rooms and reduce the cost of doctors’ idle time per working shifts by taking into account the constraints. The suggested models were applied for the surgery department of Ghaem hospital of Mashhad and solved by ILOG CPLEX 12.6.1 Microsoft Visual Studio environment. The results show that the deterministic proposed model increases the average efficiency of hospital to 38.275% and the stochastic model increases the average efficiency to 85.32%.
Reza Alikhani; Mahmoud Saremi
Abstract
The scheduling of preventive maintenance and replacement is one of the crucial issues in the literature of system reliability and maintenance engineering. The importance of this issue is more evident in series system in which by stopping a component the whole system will stop. However, the quest of the ...
Read More
The scheduling of preventive maintenance and replacement is one of the crucial issues in the literature of system reliability and maintenance engineering. The importance of this issue is more evident in series system in which by stopping a component the whole system will stop. However, the quest of the efficient periodicity maintenance for all of component of a system which has antagonistic objectives is not a trivial task. The aim of this paper is to presenting scheduling model of preventive maintenance and replacement for series system by variable and not predetertmined periods and also by applying inflation in the model. The model is designed based on fuzzy multi-objective and integer non-linear programming. Also the proposed model is solved for a case study with numerical example and furthermore, analysis of various senarios, the effects of inflation on the model will be considered. The results show that applying inflation in the model changes not only scheduling for replacement and maintenance, but also affects the effective age of components
Darush Mohamadi Zanjirani; Majid Esmailian; Saeedeh Jokar
Abstract
Process planning involves determining the most suitable and efficient manufacturing (assembly) processes and their sequence in order to produce a product (part). These processes should be compatible with required attributes in product design documentation. Process planning and scheduling optimization ...
Read More
Process planning involves determining the most suitable and efficient manufacturing (assembly) processes and their sequence in order to produce a product (part). These processes should be compatible with required attributes in product design documentation. Process planning and scheduling optimization is done with Considering qualitative parameters which are affective on job shop and flexible system. Fuzzy Inference System and Meta-heuristic algorithms with multiple objective and goal functions are used to solving problem. Objective functions include minimization of cost and time of processing parts and maximizing the utility of the process design. based on the illustrated numerical example simulated annealing algorithm has better efficiency than imperialist competitive algorithm, particle swarm, bee colony.