Mohammadreza Dabiri; Mehdi Yazdani; bahman naderi; Hasan Haleh
Abstract
In the real world, firms with hybrid flow-shop manufacturing environment generally facethe human resource constraint, salary cost increasment and efforts to make better use oflabor, in addition to machine constraint. Given the limitations of these resources, productdelivery requierements to customers ...
Read More
In the real world, firms with hybrid flow-shop manufacturing environment generally facethe human resource constraint, salary cost increasment and efforts to make better use oflabor, in addition to machine constraint. Given the limitations of these resources, productdelivery requierements to customers have made the job rejection essential in order to meetdistinct customer requirements. Therefore, this research has studied the dual resourceconstrained hybrid flow-shop scheduling problem with job rejection in order to minimizethe total net cost (the sum of the total rejection cost and the total tardiness cost of jobs)which is widely used in many industries. In this article, a mixed integer linear programmingmodel has developed for the research problem. In addition, an improved sooty ternoptimization algorithm (ISTOA) has proposed to solve the large-sized problems as well asa decoding method due to the NP-hardness of the problem. In order to evaluate theproposed optimization algorithm, five well-known algorithms in the literature including(immunoglobulin-based artificial immune system (IAIS), genetic algorithm (GA), discreteartificial bee colony (DABC), improved fruit fly optimization (IFFO), effective modifiedmigrating birds optimization (EMBO)) have adapted with the proposed problem. Finally,the performance of the proposed optimization algorithm has investigated against theadapted algorithms. Results and evaluations show the good performance of the improvedsooty tern optimization algorithm.
Mehdi Yazdani; Mostafa Zandieh; Reza Tavakkoli-Moghaddam
Volume 12, Issue 33 , July 2015, , Pages 43-74
Abstract
In this paper, the dual-resource constrained flexible job-shop scheduling problem (DRCFJSP) with objective of minimizing the makespan is investigated. Under studied problem is NP-hard and mainly includes three sub-problems. The first one is to assign each operation to a machine out ...
Read More
In this paper, the dual-resource constrained flexible job-shop scheduling problem (DRCFJSP) with objective of minimizing the makespan is investigated. Under studied problem is NP-hard and mainly includes three sub-problems. The first one is to assign each operation to a machine out of a set of capable machines, the second one is to determine a worker among a set of skilled workers for processing each operation on the selected machine and the third one deals with sequencing the assigned operations on the machines considering workers in order to optimize the performance measure. In this paper, we provide a mathematical model for this problem and then propose a hybrid meta-heuristic algorithm for solving the problem. The proposed hybrid algorithm uses variable neighborhood search and simulated annealing algorithms to search in the solution space. Computational study with randomly generated test problems is performed to evaluate the performance of the proposed algorithm. The results show the proposed algorithms are effective approaches for solving the DRCFJSP.