Document Type : Research Paper

  1. Atwater, B., Stephens, A., &Chakravorty, S. (2004). The Impact of Scheduling Free Goods on the Throughput Performance of a Manufacturing Operation.International Journal of Production Research, 42(23), 4849-4869.
  2. Bell, S. (2006).Lean Enterprise Systems.JOHN WILEY & SONS, INC., PUBLICATION.
  3. Betterton, C.E., &CoxIII, J.F. (2009). Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. Int. J. Production Economics, 117, 66- 79.
  4. Chakravorty, S.S. (2001). An evaluation of the DBR control mechanism in a job shop environment .Omega. International Journal of Management Science, 29,335 - 342.
  5. Kadipasaoglu, S.N. ,  Xiang, W. , &Hurley, S.F. (2000). A study on the effect of the extent and location of protective capacity in flow systems.Int. J. Production Economics,63, 217 – 228.
  6. Mahapatra, S.S. &Sahu, A. (2006, July). APPLICATION OF THEORY OF CONSTRAINTS ON SCHEDULING OF DRUM-BUFFER-ROPE SYSTEM.International Conference on Global Manufacturing and Innovation.
  7. Schragenhiem, E. ,&Dettmer, H.W. (2000).Manufacturing at Warp Speed:Optimizing Supply Chain Business Performance.Boca Raton, FL: St. Lucie Press.
  8. Schragenhiem, E. ,&Ronen, B. (1990). Drum-Buffer-Rope Shop floor control.Production and inventory management journal, Third quarter.
  9. Wu, S.Y. , Morris, J.S. , &Gordon, T.M. (1994). A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Computers ind.Engng,26(4), 757 – 764.