Volume 21 (2023)
Volume 20 (2022)
Volume 19 (2021)
Volume 18 (2020)
Volume 17 (2019)
Volume 16 (2018)
Volume 15 (2017)
Volume 14 (2016)
Volume 13 (2015)
Volume 12 (2015)
Volume 11 (2014)
Volume 9 (2012)
Volume 10 (2012)
Volume 8 (2010)
Volume 6 (2007)
Volume 5 (2006)
Volume 4 (2006)
Volume 3 (2005)
Volume 2 (2004)
Volume 1 (2003)
Using Fuzzy Multi-Criteria Assessment Method (Fuzzy AHP) in the Best Sequence Selection in a Single Machine Shop

Nasim Ekram Nosratian

Volume 8, Issue 20 , March 2011, , Pages 129-146

Abstract
  One of the main steps in production planning is the operation sequencing. The operation sequencing is assessed by a series of efficiency indexes such as jobs completion average time, jobs maximum tardiness and jobs average tardiness. In order to accomplish these efficiency indexes, some heuristic rules ...  Read More