Determining critical paths of projects by a new hybrid approach based on developed MULTIMOORA and SWARA methods under consideration of time, cost, quality, risk and safety criteria in an interval type-2 fuzzy environment

Yahya Dorfeshan; Seyed Meysam Mousavi; Behnam Vahdani

Volume 20, Issue 67 , February 2023, , Pages 85-119

https://doi.org/10.22054/jims.2022.25775.1887

Abstract
  Critical path method is one of the most widely used approaches in planning and project control. Time is considered a determinative criterion for the critical path. But it seems necessary to regard other criteria in addition to time. Besides time criterion, effective criteria such as quality, cost, risk ...  Read More