Developing two multi-objective algorithms for solving multi-objective flexible job shop scheduling problem considering total consumed power per month

Seyed Habib A Rahmati; Mostafa Zandieh

Volume 10, Issue 27 , January 2012, , Pages 118-143

Abstract
  In this paper, to make flexible job shop scheduling problem (FJSP)more realistic, an operational factor is considered in its model. Thisfactor, which is called optimizing total consumed electric power permonth, is known as the most important factor in calculation of theelectric cost of the industries. ...  Read More