Volume 21 (2023)
Volume 20 (2022)
Volume 19 (2021)
Volume 18 (2020)
Volume 17 (2019)
Volume 16 (2018)
Volume 15 (2017)
Volume 14 (2016)
Volume 13 (2015)
Volume 12 (2015)
Volume 11 (2014)
Volume 9 (2012)
Volume 10 (2012)
Volume 8 (2010)
Volume 6 (2007)
Volume 5 (2006)
Volume 4 (2006)
Volume 3 (2005)
Volume 2 (2004)
Volume 1 (2003)
Meta-Heuristic Algorithms for Two-Stage Assembly Flow Shop Scheduling Problem with Considering Setup Times of Machines

Mehdi Yazdani

Volume 18, Issue 58 , October 2020, , Pages 307-335

https://doi.org/10.22054/jims.2020.47551.2394

Abstract
  This paper deals with the problem of two-stage assembly flow shop scheduling with considering sequence-independent setup times .The objective is to minimize totalcompletion times of all orders. In this problem, there are several orders for one type of product. Each ordered product is formed of several ...  Read More