[1] Y. Demir, S. Kursat Isleyen (2013). Evaluation of mathematical models for flexible job-shop scheduling problems, Applied Mathematical Modelling, 37, 977–988.
[2] C.Y. Lee, T.C.E. Cheng, B.M.T. Lin (1993). Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem, Management Science, 39(5), 616–625.
[3] C.N. Potts, S.V. Sevast’janov, V.A. Strusevich, L.N.V. Wassenhove, C.M. Zwaneveld (1995). The two-stage assembly scheduling problem, Complexity and approximation, Operations Research, 43(2), 346–355.
[4] A. Allahverdi, F.S. Al-Anzi (2006). A PSO and a tabu search heuristics for assembly scheduling problem of the two stage distributed database application, Computers and Operations Research, 33(4), 1056–80.
[5] M. Yokoyama, D.L. Santos (2005). Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times, European Journal of Operational Research, 161, 754–770.
[6] P. Fattahi, S.M. Hosseini, F. Jolai, R. Tavakkoli-Moghaddam (2013). A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations, Applied Mathematical Modelling 38, 119–134.
[7] M. Yokoyama (2008). Flow-shop scheduling with setup and assembly operations, European Journal of Operational Research, 187, 1184–1195.
[8] A.M.A. Hariri, C.N. Potts (1997). A branch and bound algorithm for the two-stage assembly scheduling problem, European Journal of Operational Research, 103, 547–556.
[9] T.C.E. Cheng, G. Wang (1999). Scheduling the fabrication and assembly of components in a two-machine flow shop, IIE Transactions, 31, 135–143.
[10] M. Yokoyama (2001). Hybrid flow-shop scheduling with assembly operations, International Journal of Production Economics, 73(2), 103–116.
[11] C. Koulamas, G.J. Kyparisis (2001). The three-stage assembly flow shop scheduling problem, Computers and Operations Research, 28(7), 689–704.
[12] A. Allahverdi, F.S. Al-Anzi (2006). Evolutionary heuristics and an algorithm for the two- stage assembly scheduling problem to minimize makespan with setup times, International Journal of Production, 44(22), 4713–35.
[13] F.S. Al-Anzi, A. Allahverdi (2007). A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times, European Journal of Operational Research, 182(1), 80–94.
[14] A. Mozdgir, S.M.T. Fatemi Ghomi, F. Jolai, J. Navaei (2013). Two-stage assembly flow-shop scheduling problem with non-identical assembly machines considering setup times, International Journal of Production Research, 51(12), 3625–42.
[15] A. Tozkapan, O. Kirca, C.S. Chung (2003). A branch and bound algorithm to minimize the total weighted flow time for the two-stage assembly scheduling problem, Computers and Operations Research, 30(2), 309–20.
[17] R.W. Eglese (1990). Simulated annealing: a tool for operational research, European journal of operational research, 46(3), 271–81.
[18] R. Storn, K. Price. Differential evolution – a simple and efficient heuristic for global optimization over continuous space, Journal of global optimization 11(4) (1997) 341–59.
[19] N. Mladenovic, P.V. Hansen (1997). A variable neighborhood search, Computers & Operations Research, 24(11), 1097–100.
[20] F. Glover (1986), Future paths for integer programming and links to artificial intelligence, Computers and Operations Research, 13(5), 533–49.
[21] M. Dorigo, L.M. Gambardella (1997). Ant colony system: a cooperative learning approach to the traveling sales man problem, IEEE Transactions on Evolutionary Computation, 1(1), 53–66.
[22]
A. Bagheri,
M. Zandieh,
I. Mahdavi, M. Yazdani (2010). An artificial immune algorithm for the flexible job-shop scheduling problem, Future Generation Computer Systems, 26(4), 533–541.
[23] E. Atashpaz-Gargari, C. Lucas (2007). Imperialist competitive algorithm: an algorithm for optimization inspired by imperialistic competition, in: CEC IEEE Congress on Evolutionary Computation.
[24] M. Sevkli, M.E. Aydin )2007(. Parallel variable neighbourhood search algorithms for job shop scheduling problems, IMA Journal of Management Mathematics, 18(2), 117–133.
[25] M. Zandieh, S.M.T. Fatemi Ghomi, S.M. Moattar Husseini (2006). An immune algorithm approach to hybrid flow shops scheduling with sequencedependent setup times, Applied Mathematics and Computation, 180(1), 111-127.
[26] D. Dasgupta (2002) Special issue on artificial immune system, IEEE Transactions on Evolutionary Computation 6, 225-256.
[27] L.N.D. Castro, J. Timmis (2002). An artificial immune network for multimodal function optimization, Evolutionary computation, CEC'02, in: Proceedings of the Congress, pp. 699-704.
[29] G.C. Luh, C.H. Chueh (2009). A multi-modal immune algorithm for the job-shop scheduling problem, Information Sciences, 179(10), 1516-1532.
]30[ یزدانی، مهدی، زندیه، مصطفی، توکلی مقدم، رضا (1393) یک الگوریتم فراابتکاری ترکیبی برای مسئله زمان بندی کار کارگاهی منعطف با منابع دوگانه محدود انسان و ماشین، مطالعات مدیریت صنعتی، شماره 33، 43-74.