Altendorfer, K. & Minner, S., (2011). "Simultaneous optimization of capacity and planned lead time in a two stage production system with different customer due dates". European Journal of Operational Research. .213, 134146.
Billington, P., McClain, J. & Thomas, L.J., (1983). "Mathematical Programming Approaches to Capacity-Constrained ππ
π Systems: Review, Formulation, and Problem Reduction". Management Science, 29, 1126-1141.
Borodin, V., Hnaien, F. & Dolgui, A. "andom lead times in replenishment planning for single-level assembly systems: The value of information ". IFAC PapersOnLine 50-1 (2017) 1205–1210.
Claire Berchet & Georges Habchi ,.(2005). "The implementation and deployment of an ERP system: An industrial case study". Computers in Industry.588–605.
Dolgui, A. & Ould-Louly, M.-A., (2002). "A Model for Supply Planning under Lead Time Uncertainty". International Journal of Production Economics, 78, 145-152.
Dolgui, A., Ben Ammar, O., Hnaien, F. & Louly M.A.O., (2013). "A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty". Studies in Informatics and Control, 22, 255-268.
George Ioannou. & Stavrianna Dimitriou., (2012) . "Lead time estimation in MRP/ERP for make-to-order manufacturing systems". International Journal of Production Economics, 139,551–563.
Haeussler, S. & Schneckenreither, M, (2019). "Adaptive Order Release Planning with Dynamic Lead Times". IFAC PapersOnLine 52-13 (2019) 1890–1895.
Hencha, R. & Verma, D. "Study Of Material Requirement Planning Processes & Its Analysis And Implementation (A Case Study Of Automobile Industry) ". International Journal of Scientific & Technology Research. Corpus ID: 203119427.
Kanet, J., (1986). "Toward a Better Understanding of Lead Times in MRP Systems". Journal of Operations Management, 6, 305-313.
Klaus Altendorfer,.(2015)."Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times". International Journal of Production Economics, 47,499-230.
Manuel Díaz-Madroñero. Josefa Mula & Mariano Jiménez. (2015). "Material Requirement Planning under Fuzzy Lead Times. IFAC-PapersOnLine, 48-3-242–247.
Milne, R. J., Mahapatra, S., Wang, C. T., (2015). Optimizing planned lead times For Enhancing Performance of ππ
π Systems,. International Journal of Production Economics. 167–220–231.
Miltenburg, J, (2001). Computational complexity of algorithms for MRP and JIT production planning problems in enterprise resource planning systems, Production Planning & Control: The Management of Operations, 12:2, 198-209, DOI: 10.1080/09537280150501293.
Orlicky, J. A., (1975). Material Requirements Planning, 1st edition. McGraw-Hill: New York.
Ould-Louly, M.A. & Dolgui, A., (2004). "The MPS parameterization under lead-time Uncertainty". International Journal of Production Economics.90, 369–376.
Plossl, G. & Orlicky’s (1994). "Material Requirements Planning", 2nd edition. Mc Graw-Hill: New York.
Pooya, M & Pakdaman, M, (2017). "Optimal control model for ο¬nite capacity continuous MRP with deteriorating items". Journal of Intelligent Manufacturing, 10845-017-1383-6.
Ptak, C. , Smith, C. & Orlicky’s (2011). "Material Requirements Planning", 3rd edition.Mc Graw-Hill: New York.
Spitter, J. M., de Kok, A. G. & Dellaert, N.P., (2003). "Cost implications of planned lead times in supply chain operations planning". working paper.
Teo C-C., Bhatnagar R. & Graves, S.C., (2011). "Setting planned lead times for a make-to order production system with master schedule smoothing". IIE Transactions, 43,399-414.
Thanh-Ha Nguyen. & Mike Wright., (2015). "Capacity and lead-time management when demand for service is seasonal and lead-time sensitive". European Journal of Operational Research 247,588–595.
Watcharapan Sukkerd & Teeradej Wutti pornpun,.(2016). "Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations",. Computers & Industrial Engineering 97 – 157–169.