1. Allahverdi, A., Gupta, J. N., & Aldowaisan, T. (1999). A review of scheduling research involving setup considerations. Omega, 27(2), 219–239. https://doi.org/10.1016/S0305-0483(98)00042-5
2. Costa, A., Cappadonna, F. A., & Fichera, S. (2014). Joint optimization of a flow-shop group scheduling with sequence-dependent set-up times and skilled workforce assignment. International Journal of Production Research, 52(9), 2696–2728. https://doi.org/10.1080/00207543.2013.867088
3. Costa, A., Fernandez-Viagas, V., & Framinan, J. M. (2020). Solving the hybrid flow shop scheduling problem with limited human resource constraint. Computers & Industrial Engineering, 146, 106545. https://doi.org/10.1016/j.cie.2020.106545
4. de Athayde Prata, B., de Abreu, L. R., & Fernandez-Viagas, V. (2025). A systematic review of permutation flow shop scheduling with due-date-related objectives. Computers & Operations Research, 106989. https://doi.org/10.1016/j.cor.2024.106989
5. Elissaouy, O., & Allali, K. (2024). Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time. RAIRO-Operations Research, 58(1), 373–395. https://doi.org/10.1051/ro/2023005
6. Geng, J. C., Cui, Z., & Gu, X. S. (2016). Scatter search based particle swarm optimization algorithm for earliness/tardiness flowshop scheduling with uncertainty. International Journal of Automation and Computing, 13(3), 285–295. https://doi.org/10.1007/s11633-015-0938-3
7. Geurtsen, M., Adan, J., & Akçay, A. (2023). Integrated maintenance and production scheduling for unrelated parallel machines with setup times. Flexible Services and Manufacturing Journal. https://doi.org/10.1007/s10696-023-09483-2
8. Han, J. H., & Lee, J. Y. (2023). Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing. Engineering Optimization, 55(10), 1742–1759. https://doi.org/10.1080/0305215X.2022.2106754
9. Hayat, I., Tariq, A., Shahzad, W., Masud, M., Ahmed, S., Ali, M. U., & Zafar, A. (2023). Hybridization of particle swarm optimization with variable neighborhood search and simulated annealing for improved handling of the permutation flow-shop scheduling problem. Systems, 11(5), 221. https://doi.org/10.3390/systems11050221
10. Kress, D., Müller, D., & Nossack, J. (2019). A worker constrained flexible job shop scheduling problem with sequence-dependent setup times. OR Spectrum, 41(1), 179–217. https://doi.org/10.1007/s00291-018-0537-7
11. Mlekusch, J., & Hartl, R. F. (2025). The dual-resource-constrained re-entrant flexible flow shop: A constraint programming approach and a hybrid genetic algorithm. International Journal of Production Research, 63(5), 1803–1824. https://doi.org/10.1080/00207543.2024.2301123
12. Mousavi, S. M., & Shahnazari-Shahrezaei, P. (2023). Minimizing the makespan and total tardiness in hybrid flow shop scheduling with sequence-dependent setup times. Management and Production Engineering Review, 14(1), 13–24. https://doi.org/10.24425/mper.2023.146035
13. Mraihi, T., Driss, O. B., & El-Haouzi, H. B. (2024). Distributed permutation flow shop scheduling problem with worker flexibility: Review, trends and model proposition. Expert Systems with Applications, 238, 121947. https://doi.org/10.1016/j.eswa.2023.121947
14. Ouchiekh, R., Fri, M., Touil, A., & Echchatbi, A. (2021). Total weighted tardiness in the permutation flow shop under uncertainty. IFAC-PapersOnLine, 54(1), 1174–1180. https://doi.org/10.1016/j.ifacol.2021.08.139
15. Pinedo, M. (2022). Scheduling: Theory, algorithms, and systems (6th ed.). Springer. https://doi.org/10.1007/978-3-030-87000-8
16. Rahman, H. F., Janardhanan, M. N., Chuen, L. P., & Ponnambalam, S. G. (2021). Flowshop scheduling with sequence-dependent setup times and batch delivery in supply chain. Computers & Industrial Engineering, 158, 107378. https://doi.org/10.1016/j.cie.2021.107378
17. Silva, A. F., Valente, J. M., & Schaller, J. E. (2022). Metaheuristics for the permutation flowshop problem with a weighted quadratic tardiness objective. Computers & Operations Research, 140, 105691. https://doi.org/10.1016/j.cor.2021.105691
18. Utama, D. M., Umamy, S. Z., & Al-Imron, C. N. (2024). No-wait flow shop scheduling problem: A systematic literature review and bibliometric analysis. RAIRO-Operations Research, 58(2), 1281–1313. https://doi.org/10.1051/ro/2024008
19. Ying, K. C., Pourhejazy, P., & Lin, Z. R. (2025). Scheduling with sequence-dependent setup times in short-term production planning: A main path analysis-based review. Operations Research Perspectives, 100340. https://doi.org/10.1016/j.orp.2024.100340
1. Behnamian, J., & Afsar, A. (2010). Optimization of the sum of lateness and energy penalties in the scheduling problem of heterogeneous parallel machines using memetic algorithms. Industrial Management Studies, 18(58), 29–57. https://doi.org/10.22054/jims.2020.24828.1856 [In Persian]
2. Dabiri, M. R., Yazdani, M., Naderi, B., & Haleh, H. (1400). Mathematical model and meta-heuristic algorithm for the hybrid shop flow scheduling problem with dual limited resources and considering job backlogs. Industrial Management Studies, 19(60), 237–284. https://doi.org/10.22054/jims.2021.48976.2425 [In Persian]
3. Mosayeb Motlagh, M., Azimi, P., & Amiri, M. (1402). Optimization of multi-product production lines with a simulation and multi-objective programming approach. Industrial Management Studies, 21(68), 75–120. https://doi.org/10.22054/jims.2019.30723.2015 [In Persian]
4. Yazdani, M. (2019). Metaheuristic algorithms for the scheduling problem of two-stage assembly shop flow considering machine setup times. Industrial Management Studies, 18(58), 307–335. https://doi.org/10.22054/jims.2020.47551.2394 [In Persian]