Abstract

In this paper classical inventory models, EOQ and EPQ, are developed considering holding and purchasing costs as an increasing continuous function of the ordering cycle time. Two models are presented: first one is economic order quantity and the second one is economic production quantity. Both models are formulated such that backorder is not permitted. Since the obtained model is a type of nonlinear continuous program, solving it with exact methods is impossible at the reasonable time, hence genetic algorithm and particle swarm optimization algorithm are presented to solve the problems. In addition, to increase effectiveness of algorithms, Taguchi method is used for parameters tuning. Finally a numerical example is presented to comprise two methods and results are illustrated.

Keywords

Hadley, G., Whitin, T.M., (1975), An optimal final inventory model, Prentic Hall.
Pan, C.H., Lo, M.C., Hsiao.Y.C.,(2004), optimal reorder point inventory models with variable lead time and backorder discount considerations, Europen Journal of Operational Research, 158, 488-505
Sphicas, G.p., (2006), EOQ and EPQ with linear and fixed backorder costs: two cases identified and models analyzed without calculus, Int. J. Production Economiccs, 100, 59-64.
Goh, M.,(1992), Some results for inventory models having inventory level dependent demand rate, International Journal of Operational Economiccs, 27(1), 155-160.
Girin, B.C., Goswami, A., Chaudhuri, K.s., (1996), An EOQ model for deteriorating items with time-varying demand and costs, Journal of Operational Research Society, 47(11), 1398-1405
Baker, R.C., Urban, T.L., (1988),a deterministic inventory system with an inventory-level-dependent demand rate, Journal of Operational Research Society, 39(9), 823-831.
Axsater, S., Initiation of an inventory control system when the demand starts at given time, International Journal of Production Economics, 2011, doi:10.1016/j.ijpe.2011.5.028.
Bai, L., et al., A simple and robust batch-ordering inventory policy under incomplete demand knowledge, Computer & Industrial Engineering, 2012, 63, 343-353.
Alfares, H.K.,(2007), Inventory model with stock-level dependent demand rate and quantity based holding cost,Int. J. Production Economiccs, 108-265.
Darwish, M.A., (2008), EPQ models with varying setup cost. Int. J. Production Economiccs, 113 ,297-306
Hou, L.h., (2007), An EOQ model with setup cost and process quality as functions of capital expenditure, Applied Mathematical Modelling, 31, 10-17.
مدل چندمحصولی با لحاظ کردن هزینه نگهداری و خرید به صورت تابعی... 101
Teng, J.T., Chang, H.J., Dye, C.Y., Hung C.H.,(2005), Deterministic economic production quantity models with time-varying demand and cost, Applied Mathematical Moaelling, 29, 987-1003.
Maihami, R., Nakhai, I., (2012), Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging, Mathematical and Computer Modeling, 55,1422-1733.
Jain, M., Gupta, R., (2013). ,Optimal replacement policy for a repairable system with multiple vacations and imperfect fault coverage, Computers & Industrial Engineering, 66, 710-719.
Shavandi, H., Mahlooji, H., Nosratian, N.E., (2012), A constrained multi-product pricing and inventory control problem, Applied Soft Computing, 12, 2454–2461.
Ghasemi, N., Afshar Nadjaf, B.,(2013), EOQ Models with Varying Holding Cost, Industrial Mathematics, 7.
Ghasemi, N.,(2015), Developing EPQ models for non-instantaneous deteriorating items, J Ind Eng Int, 11,427-437.