Afshar, A., A. Kaveh, and O. Shoghli, "Multi-Objective Optimization of Time-Cost-Quality Using Multi-Colony Ant Algorithm", ASIAN JOURNAL OF CIVIL ENGINEERING (BUILDING AND HOUSING). 8(2), pp. 113-124 (2007).
Babu, A.J.G. and N. Suresh, "Project management with time, cost, and quality considerations", European Journal of Operational Research. 88(2), pp. 320-327 (1996).
Baptiste, P. and S. Demassey, "Tight LP bounds for resource constrained project scheduling", OR Spectrum. 26(2), pp. 251-262 (2004).
Bellman, R.E. and L.A. Zadeh, "Decision making in a fuzzy environment", Management Sience. 17(4), pp. 141-164 (1970)
Chen, S.-P. and M.-J. Tsai, "Time–cost trade-off analysis of project networks in fuzzy environments", European Journal of Operational Research. 212(2), pp. 386-397 (2011).
Correia, I., L.L. Lourenço, and F. Saldanha-da-Gama, "Project scheduling with flexible resources: formulation and inequalities", OR Spectrum. 34(3), pp. 635-663 (2012).
Ebrahimnezhad, S., V. Ahmadi, and H. Javanshir, "Time-Cost-Quality Trade-off in a CPM Network Using", International Journal of Industrial Engineering & Production Management. 24(3), pp. 361-376 (2013).
El-Rayes, K. and A. Kandil, "Time-Cost-Quality Trade-Off Analysis for Highway Construction", Journal of Construction Engineering and Management. 131(4), pp. 477-486 (2005).
Eshtehardian, E., A. Afshar, and R. Abbasnia, "Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost", Construction Management and Economics, 26(7), pp. 679-691 (2008).
Eshtehardian, E., A. Afshar, and R. Abbasnia, "Fuzzy-based MOGA approach to stochastic time–cost trade-off problem" Automation in construction, 18(5),pp. 692-701 (2009).
Iranmanesh, H., M.R. Skandari, and M. Allahverdilloo, "Finding Pareto Optimal Front for the Multi-Mode Time, Cost, Quality Trade-off in Project Scheduling", International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering. 2(4), pp. 397-401 (2008).
Ke, H., and J. Ma, "Modeling project time–cost trade-off in fuzzy random environment", Applied Soft Computing, 19, pp. 80-85(2014).
Kerzner H., "Project management: a systems approach to planning, scheduling, and controlling", John Wiley & Sons (2013).
Khang, D.B. and Y.M. Myint, "Time, cost and quality trade-off in project management: a case study", International Journal of Project Management. 17(4), pp. 249-256 (1999).
Kim, J., C. Kang, and I. Hwang, "A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem", International Journal of Project Management, 30(2), pp. 264-272 (2012).
Mehdizadeh, E. and O. Mohsenian, "Solving time cost and quality trade off project problem using multi objective stochastic programming", Sharif Scientific Journal. 28-1(2), pp. 103-111 (2012).
Mohammadipour, F., and S. J. Sadjadi, "Project cost–quality–risk tradeoff analysis in a time-constrained problem", Computers & Industrial Engineering, 95, pp. 111-121(2016).
Monghasemi, S., M.R. Nikoo, M.A. Khaksar Fasaee, and J. Adamowski, "A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects", Expert Systems with Applications. 42(6), pp. 3089-3104 (2015).
Mungle, S., L. Benyoucef, Y. J. Son, and M. K. Tiwari, "A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project", Engineering Applications of Artificial Intelligence, 26(8), pp. 1953-1966 (2013).
Nabipoor Afruzi, E., A.A. Najafi, E. Roghanian, and M. Mazinani, "A Multi-Objective Imperialist Competitive Algorithm for solving discrete time, cost and quality trade-off problems with mode-identity and resource-constrained situations", Computers & Operations Research. 50, pp. 80-96 (2014).
Saif, A., S. Abbas, and Z. Fayed, "The PDBO Algorithm for Discrete Time, Cost and Quality Trade -off in Software Projects with Expressing Quality by Defects", Procedia Computer Science. 65, pp. 930-939 (2015).
Singh, G. and A.T. Ernst, "Resource constraint scheduling with a fractional shared resource", Operations Research Letters. 39(5), pp. 363-368 (2011).
Tareghian, H.R. and S.H. Taheri, "On the discrete time, cost and quality trade-off problem", Applied Mathematics and Computation. 181(2), pp. 1305-1312 (2006).
Tavana, M., A.-R. Abtahi, and K. Khalili-Damghani, "A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems", Expert Systems with Applications. 41(4, Part 2), pp. 1830-1846 (2014).
Xu, J., H. Zheng, Z. Zeng, S. Wu, and M. Shen, "Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project", International Journal of Project Management, 30(8), pp. 950-966, (2012).
Zhang, H., and F. Xing, "Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction", Automation in Construction, 19(8), pp. 1067-1075 (2010).