Volume 21 (2023)
Volume 20 (2022)
Volume 19 (2021)
Volume 18 (2020)
Volume 17 (2019)
Volume 16 (2018)
Volume 15 (2017)
Volume 14 (2016)
Volume 13 (2015)
Volume 12 (2015)
Volume 11 (2014)
Volume 9 (2012)
Volume 10 (2012)
Volume 8 (2010)
Volume 6 (2007)
Volume 5 (2006)
Volume 4 (2006)
Volume 3 (2005)
Volume 2 (2004)
Volume 1 (2003)
Analysis the enablers of flexible manufacturing system, using interpretive structural modelling and Interpretive ranking process

Hamid Reza Talaie; Akbar Alem Tabrz; Hasan Farsijani

Volume 15, Issue 44 , April 2017, , Pages 1-26

https://doi.org/10.22054/jims.2017.7336

Abstract
  The volatile condition of today’s market is forcing the manufacturing managers to adapt the flexible manufacturing systems (FMS) to meet the challenges imposed by international competition, ever changing customer demands, rapid delivery to market and advancement in technology. Despite various barriers ...  Read More

Presentation and Solution of Critical Chain Project Scheduling Problem (CCPSP) model with consideration of feeding buffer

Akdar Alemtabriz; Ashkan Ayough; Mahdie Baniasadi

Volume 14, Issue 42 , October 2016, , Pages 31-59

https://doi.org/10.22054/jims.2016.5707

Abstract
  During the recent years, extensive research has been done on the field ofproject scheduling. There is always uncertainty in the area of projectscheduling that causes a deviation in the real plan from the scheduled plan.One of the solutions to deal with this uncertainty is using the critical chainmethod ...  Read More

Project Risk Evaluation and Analysis Using Risk Management Based on PMBOK Standard and RFMEA Technique

Akbar Alam Tabriz; Ehsan Hamzehi

Volume 9, Issue 23 , December 2011, , Pages 1-19

Abstract
  One of the most important problems in project management is the undesirable time and cost variances of projects which are not considered before the project implementation. This problem is the result of the risks, occurring in the length of the project implementation. In this case, Risk Management based ...  Read More

Efficiency Evaluation Faculties of Shahid Beheshti University using Composed Approach of DEA and Goal Programming Model

Akbar Alam Tabriz; Razieh Faraji; Hesam Saiedy

Volume 8, Issue 19 , December 2010, , Pages 1-22

Abstract
  University is an organization with specific mission that needs to be evaluated for optimal using of resources and achieving to goals. To improve the status quo, by performance assessment could recognized weakness and strength and minimized input of resources. Thus, university has to know efficiency of ...  Read More

Process orientation by Excellency approach in production enterprises

Akbar Alam Tabriz; Mohammad Bagherzadeh Azar

Volume 5, Issue 14 , December 2006, , Pages 55-73

Abstract
  At the beginning of the last century, division of labor principle was introduced as a factor for creativity drive, and economical saving, and the requirements of such principles led to hierarchical, task and authority-oriented organizing of different enterprises and organizational levels. This results ...  Read More

Assessing the degree of readiness for the implementation of TPM (Case study conducted at SHASI SAZ IRAN Co.)

Akbar Alam Tabriz; Maryam Bahrami

Volume 4, Issue 13 , June 2006, , Pages 1-18

Abstract
  The concept of this research is, assessing the level of readiness for the implementation of Total Productive Maintenance in the SHASI SAZ IRAN Co. In order to satisfy the main goal of this research, “assessing the level of readiness for the implementation of Total Productive Maintenance in the ...  Read More

A Survey in Production Performance of Khorassan Pooya Gostar Company Using Value Engineering Methodology

Akbar Alam Tabriz; Hamed Abdollahi

Volume 3, Issue 10 , September 2005, , Pages 69-81

Abstract
  Value engineering is a collection of the organized and creative arts and skills which are guided to analyze the function of the product or the system. They aim to realize these functions with the minimum costs. Khorassan Pooya Gostar Company is the largest contractor of the Iranian car manufactures has ...  Read More